Mulch quantity calculator
Enter the area and the depth you have to hit, and see exactly how much loose fill to order, what it costs and how many truck loads it is.
Short answer
One cubic yard is 27 cubic feet, and it covers 54 sq ft at 6 inches, 36 sq ft at 9 inches, or 27 sq ft at 12 inches. Multiply your area in square feet by the depth in inches, divide by 12 for cubic feet, then divide by 27 for cubic yards, and add about 25 percent for settling.
On this page
Work out the quantity
Calculator
Mulch volume, bags, cost and loads
- Finished volume
- Volume to order, with settling
- Bags needed
- Estimated delivered cost
- Full-size pickup loads
- Approximate weight
What a cubic yard actually covers
Every quantity question on a loose fill playground comes back to one fixed conversion: a cubic yard is 27 cubic feet. Spread that over a floor area and the depth decides how far it goes.
| Finished depth | Area one cubic yard covers | Cubic yards per 1,000 sq ft |
|---|---|---|
| 3 inches (top-up only) | 108 sq ft | 9.3 |
| 6 inches | 54 sq ft | 18.5 |
| 9 inches | 36 sq ft | 27.8 |
| 12 inches | 27 sq ft | 37.0 |
Two things surprise people the first time. The first is how fast the number climbs: going from 6 inches to 9 inches is a 50 percent increase in material and in delivery trips, not a small adjustment. The second is that a 3 inch top-up across a whole play area is a real order, not a wheelbarrow. A 2,500 sq ft site needs about 23 cubic yards just to add 3 inches back.
The settling allowance sits on top of all of this. Loose fill is delivered fluffed and it compacts as soon as it is raked, walked on and rained on. Ordering the raw calculated volume is the most common way a brand new installation is already under depth on opening day. Twenty-five percent is the normal allowance, 15 percent is defensible over a firm, level, well prepared base, and 35 percent is realistic where the base is soft or uneven. Site prep and leveling is what moves you from the high number to the low one.
Bulk or bagged, and where the crossover sits
Bulk material is sold by the cubic yard and dumped on your driveway or directly in the play area. Bagged material is sold by the cubic foot at retail. The economics are not close on a real playground.
- Bulk wins on volume. You pay for material and one delivery, and the price per cubic yard is commonly a fraction of the bagged equivalent once you divide the bag price by the bag size.
- Bagged wins on access and timing. Bags fit through a gate, up a slope and into a back yard where a dump truck cannot go. They also let you buy in stages.
- The crossover is small. Below roughly 3 cubic yards, bag pricing plus a saved delivery fee can come out ahead. Above that, the bag premium compounds with every yard.
There is a sourcing trap in bagged material. Playground grade engineered wood fiber has to meet ASTM F2075 for particle size, consistency and contaminant limits2, and most bagged landscape mulch at a big box store is not that product. Landscape bark, colored mulch and cocoa shell are decorative materials with no tested critical height. Engineered wood fiber explains what separates the two, and what not to use lists the materials that should never go under equipment at all.
Delivery minimums, driveways and weight
Bulk yards almost always set a minimum load, commonly 3 cubic yards, and charge delivery per trip rather than per yard. That has three consequences worth planning for.
Round up to full trucks. If a truck carries 10 cubic yards and you need 41, you are paying for five trips whether you order 41 or 50. Ordering the round number gives you the first year of top-up material for the cost of nothing extra, provided you have somewhere dry to keep it.
Check where the truck can reach. A tandem dump truck needs overhead clearance, a firm surface and room to raise a bed. Soft turf, a tight cul-de-sac or a low tree limb turns one delivery into a double handle by wheelbarrow, which is the single largest hidden labor cost on a mulch job.
Watch the weight. Wood based loose fill commonly runs 500 to 800 pounds per cubic yard dry, and considerably more saturated. Ten cubic yards is several tons sitting in one spot on a residential driveway, and concrete with a thin base can crack under a loaded truck. Put the pile on plywood or on the street where the municipality allows it.
The pickup loads output uses 2 cubic yards per load, which is about what a full-size 8 foot bed holds level to the rails. Volume is not your limit, payload is. Two yards of damp wood fiber can exceed the payload rating of a half-ton truck, so a small trailer or a paid delivery is usually both safer and cheaper than four trips.
How long it takes to spread
Ordering is the easy half. Budget the labor honestly:
- Machine spread: a skid steer working directly in an open play area can move and rough grade 8 to 12 cubic yards an hour, then a crew rakes to final depth.
- Wheelbarrow and rake: plan on roughly 1 to 2 cubic yards per person per hour over a short haul, dropping fast once the run is longer than about 50 feet or goes uphill.
- Final depth check: a gauge stick or a mark on a post at every use zone, not an eyeball. Depth at the swing seat and the slide exit is what gets inspected.
A 40 cubic yard order is therefore a machine job or a very long volunteer day. Surfacing installation walks through excavation, base, containment and finish grade, and drainage and base layers covers the part under the mulch that decides whether it stays where you put it.
What to do next
Take the ordered volume into the surfacing cost calculator to see the ten year picture rather than the delivery ticket, because material price is a minority of lifetime cost on loose fill. If you are still choosing between materials, how much mulch do I need works through the same math from the material side and explains why depth matters more than the label on the bag.
Frequently asked questions
How many cubic yards of mulch do I need for 1,000 square feet?
At a 9 inch finished depth, 1,000 sq ft needs 750 cubic feet, which is 27.8 cubic yards before settling and about 35 cubic yards ordered with a 25 percent allowance. At 6 inches the same area needs 500 cubic feet, or 18.5 cubic yards finished. Depth is set by fall height, not by budget.
Is bagged mulch ever cheaper than bulk?
Only on very small jobs. Bagged material commonly runs two to four times the delivered price per cubic yard, because you are paying for the bag, the pallet and the retail handling. Below roughly 3 cubic yards, bag pricing plus no delivery fee can still win. Above that, bulk is almost always cheaper.
How many bags of mulch are in a cubic yard?
Divide 27 by the bag size in cubic feet. A 2 cubic foot bag gives 13.5 bags per cubic yard, a 3 cubic foot bag gives 9, and a 1.5 cubic foot bag gives 18. Playground grade engineered wood fiber is usually sold in bulk, so check that the bagged product you find actually meets ASTM F2075.
Can I haul playground mulch in a pickup truck?
In small quantities. A full-size 8 foot bed holds roughly 2 cubic yards level to the rails, but weight is the real limit. Wood loose fill commonly runs 500 to 800 pounds per cubic yard dry and much heavier wet, so two yards can exceed a half-ton truck's payload. Ask the yard for the weight before you load.
Should I order extra for the first top-up?
Order the settling allowance now and budget the top-up separately. The settling allowance covers compaction during installation and the first few weeks of use. Seasonal top-up under swings and at slide exits is an operating cost that recurs every year, and it is usually 10 to 20 percent of the original volume annually on a busy site.
Sources
- 1Public Playground Safety Handbook. US Consumer Product Safety Commission, 2010Publication 325, Table 2 critical heights and loose fill depth guidance
- 2ASTM F2075, Engineered Wood Fiber for Use as a Playground Safety Surface Under and Around Playground Equipment. ASTM InternationalParticle size, consistency and contaminant limits for EWF
- 3ASTM F1292, Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment. ASTM InternationalThe drop test behind every critical height claim